2012 Capital Roadway Rehabilitation Program: Bid Results as of 7/27/2012

 
 
VILLAGE OF GURNEE
NOTICE TO BIDDERS
 
Municipality: VILLAGE OF GURNEE
Road District WARREN
County LAKE
Project No. 8321
 
TIME AND PLACE OF OPENING OF BIDS:
Sealed proposals for the improvement described below will be received at the office of the Village of Gurnee,
Engineering Department, 325 N. O’Plaine Road, Gurnee, Illinois 60031, until 10:30 A.M., JULY. 26, 2012. Proposals
will be opened and read publicly at that time.
 
DESCRIPTION OF WORK:
“2012 CAPITAL ROADWAY REHABILITATION PROGRAM”
 
LOCATION:
Rudd Court from Delany Road to Greenleaf Street
Stratton Lane from Hamilton Drive to Buchanan Drive
Buchanan Drive from Stratton Lane to Hamilton Drive
 
PROPOSED IMPROVEMENT:
Roadway improvements include the reconstruction and resurfacing of various roadways. This improvement
includes the following approximate items: 200 CY Earth Excavation, 350 CY Unsuitable Subgrade Excavation,
1,700 SY of Pavement Removal Milling 6-Inches, 7,000 SY of HMA Surface Removal, 3,000 FT of Curb &
Gutter, 1,100 SY Pavement Patching-Class D, 1,000 SY Aggregate Base Course, 530 Tons Hot-Mix Asphalt
Binder Course, 975 Tons Hot-Mix Asphalt Surface Course, N50, 2 EA Storm Inlets TY-A, 1,200 SY Topsoil
Furnish and Seeding and all other work necessary to complete the improvements.
 
BIDDERS INSTRUCTIONS:
 
1. Plans and proposal forms will be available in the office of the Village of Gurnee, 325 N. O’Plaine Road,
Gurnee, Illinois 60031 for a non-refundable cost of $100.
 
2. The Submittal of current IDOT Certificate of Eligibility (Form BC-733) and Affidavit of Availability (Form
BC-57) is required as provided for in Check Sheet LRS 6 of the “Supplemental Specifications and
Recurring Special Provisions,” prepared by the Department of Transportation.
 
3. All proposals must be accompanied by a proposal guarantee as provided in Check Sheet LRS 6 of the
“Supplemental Specifications and Recurring Special Provisions,” prepared by the Department of
Transportation.
 
4. The awarding authority reserves the right to waive technicalities and to reject any or all proposals as
provided in Check Sheet LRS 6 of the “Supplemental Specifications and Recurring Special Provisions,”
prepared by the Department of Transportation.
 
By Order Of The:
Village of Gurnee
(Awarding Authority)
Andy Harris
Village Clerk

 

AttachmentSize
Legal Notice Village of Gurnee Project 8321.pdf9.13 KB
2012_Roadway_Rehab_Bidder_List_07-23-12.pdf44.12 KB
2012_Roadway_Rehab_Bid_Results_07-27-12.pdf12.57 KB