Search Results
The current ComEd rate was recently reset BELOW our aggregation program rate. The current ComEd rate is $0.0729 per kWh. The Village’s program rate is $0.0738 per kWh. Residents can return to th...
The Village of Gurnee continues to work with county, state and federal officials to address concerns regarding the use of the chemical ethylene oxide (EtO), at the Vantage Specialty, Inc facility loca...
As a reminder, residents should be receiving their notice letter this week notifying our switch to Eligo Energy from MC Squared. All residents will still be ComEd customers and still continue to recei...
The Village has contracted with MC Squared Energy Services LLC to offer a 25% renewable energy program. They were selected, as part of a competitive bid, to serve eligible residents and small business...
FOR IMMEDIATE RELEASE: Date: Friday, October 8, 2021 Contact: Jodi Luka, Management Analyst Phone: (847) 599-6601 Email: jluka@fire.gurnee.il.us The Village of Gurnee and Wa...
The Illinois Department of Transportation has announced that they will be demolishing the Union Pacific Railroad Bridge now that the tracks have been switched to the temporary bridge. This demolition ...
The Village’s residential waste and recycling contract with Waste Management (WM) is set to expire at the end of May 2024. WM issued a statement that a contract renewal would include significant...
A section of Grandville Avenue between Northwestern Avenue and the railroad tracks will be temporarily closed on Monday, July 23rd in order to facilitate the urgent replacement of an underground pipe....
IDOT contractors are currently performing milling work from I-94 east to Route 21 as a continuation of the 2018-2019 IDOT construction project to resurface Grand Avenue in sections. Once the section f...
GURNEE - Since June 1, 2018, seventy one (71) vehicle burglaries and seventeen (17) vehicle trespass incidents have been reported in neighborhoods throughout the Village. Most of these vehicle entri...
Long before the removal of the 200,000 gallon Old Grand Water Tower in 2018, plans were underway for the construction of a 2,000,000 gallon water tower on a vacant parcel owned by the Village on Knowl...
To increase water pressure west of I-94 and add redundancy and storage to the Gurnee water system, the Village is installing a two million gallon tank at 1525 Knowles Road. This tower will be a multi-...