Minutes of the Budget Hearing of the Gurnee Village Board - March 28, 2011

MINUTES OF BUDGET HEARING #4
OF THE GURNEE VILLAGE BOARD
 
GURNEE VILLAGE HALL
MARCH 28, 2011
 
Call to Order
Mayor Kovarik called Budget Hearing #4 to order at 6:31 p.m.
 
Other Officials in Attendance
James T. Hayner, Village Administrator; Patrick Muetz, Assistant to Administrator; David Ziegler, Community Development Director; Scott Drabicki, Village Engineer; Chris Velkover, Information Systems Director
 
Roll Call
PRESENT:       5- Ross, Jacobs, Balmes, Morris, Schwarz
ABSENT:         1- Garner  
 
 
 
1) Capital Budget
 
Village Engineer Scott Drabicki presented the Motor Fuel Tax Power Point to the Board.
 
a)     Motor Fuel Tax Fund
          Dedicated source of funding from the state
          19.0 cents per gallon collected by IL
          State distributes portion monthly to local agencies including Counties, Townships, and Municipalities
          Funds must be used in accordance with 605 ILCS 5/7-202 (vehicle, transit, or pedestrian related projects)
 
MFT Funding
Estimated Beginning Fund Balance: $1,915,000
FY 11/12 Revenues:  $748,000
Total Resources: $2,740,500
Funding Requests: ($1,840,000)
Ending Fund Balance: $915,000
 
Cemetery Road Project
          American Recovery and Reinvestment Act – IDOT is fronting the construction costs
          2011-12 Consulting engineer $60k
          2011-12 Construction reimbursement partial payment to IDOT $200k
          Balance due will be invoiced by IDOT in FY 12/13
 
2011 Rehabilitation Project
          Total Length (Village Jurisdiction) – 120 Miles
          Total 2011 Resurfacing Length – 3 Miles or 2.5% of Total Length (approx 40 year life cycle)
          No Capital Improvement Funds this year
 
Motor Fuel Tax
          Roadway crack sealing $40k
          Roadway striping $40k
          Roadway rehabilitation $1.5M
          Resurfacing $1.3M
          Patching $200k
 
Questions & Discussion:
 
Mayor Kovarik asked how much of the 19 cents per gallon tax collected on gas does the Village receive.
 
Mr. Drabicki said he was not sure but less than half.
 
Next Village Engineer Scott Drabicki presented the Capital Improvement Fund Power Point to the Board.
 
b)     Capital Improvement Fund
       No dedicated source of funding
       Historical sources of funding have been:
          General Fund surplus - Surplus from prior year is transferred into the following year Capital Fund
          Reimbursements from other government agencies (IDOT, FEMA, etc.)
          Impact fees
          Grants
          Interest earned
       $1.7M proposed to be transferred at the end of FY 10/11 for use in FY 11/12
 
Capital Improvement Funding Summary
Estimated Beginning Fund Balance: $3,041,000
FY 11/12 Revenues: $405,000
Total Resources: $3,446,000
Funding Requests: ($2,875,000)
Ending Fund Balance: $571,000
 
Capital Improvement - Professional Services
          Engineering Consultant $10,000 - Material testing
          Greenleaf Street Engineering $6,000 - Permitting
          Cemetery Road Engineering $110,000
 
Capital Improvement - Projects
          Inter / Intra Network $45,000 - Connecting Village facilities
          Cemetery Road (LCDOT & WTHD) $1,100,000 - Pass through expense
          Detention Improvements $330,000 - Impact fees fund this line item
          Washington Street (Six Flags to Cemetery Rd) LCDOT $10,000
 
Capital Improvement- Technology
          Data Storage System $54,000 - Supporting permitting and asset management solution
          Permitting Software $75,000 - Will likely be integrated with asset management solution
          Asset Management Software $20,000 - In conjunction with asset management solution in Utility Surplus Fund
 
Capital Improvement
Buildings
          Public Works Lightning Protection $28,000 - 3 strikes in recent history with 2 in the last year that damaged the supervisory control system
          Fire Department $125,000 - FS1 Apparatus bay floor & FS2 Roof
 
Capital Improvement
Fleet
          Street Division Public Works Department $500,000 - 2 trucks with plow, hook lift system, dump bed, V body spreader, and spreader controls, 3 new spreader controls for existing fleet,1 trailer with 30,000 lb capacity
          Police Department $92,000 - 4 marked squads
          Fire Department $30,000 - 1 SUV command vehicle
 
Capital Improvement
Equipment
          Fire Department $80,000 - $70,200 Grant with 10% local share for SCBA Fill Station and PPE Extractors & Dryers
          Opticom Improvements $10,000 - LCDOT & IDOT traffic signal projects
 
Capital Improvement
Real Estate
          Flood plain land acquisition $100,000
          Misc. land acquisition $100,000
          Property taxes $3,000
          Appraisal fees $1,000
 
Questions and Discussion:
 
Trustee Balmes asked about the two new trucks.
 
Mr. Drabicki said we are replacing two older trucks.
 
Trustee Balmes asked if we are keeping the older trucks.
 
Mr. Hayner said they are not worth keeping.
Mayor Kovarik asked if we are managing all the Village vehicles.
 
Larry Dunn, Fleet Administrator, said yes everything is being managed. 
 
Village Engineer Scott Drabicki presented the Utility Surplus Power Point to the Board.
 
    c)     Utility Surplus Fund
 
Utility Surplus Funding
          Dedicated source of funding from connection and usage charges
          Water and Sewer Operating fund covers the day to day operations to supply water and sewer services.
          Fund balance may be used in Utility Surplus Fund for capital improvements
 
Utility Surplus Funding
Estimated Beginning Operating & Capital Fund Balance: $3,879,000
Operating Fund Revenues: $7,313,000
Total Resources: $11,192,000
Operating Funding Requests: ($6,582,000)
Capital Funding Requests: ($391,000)
Ending Operating & Capital Fund Balance: $4,219,000
 
Utility Surplus
Construction
          IL Route 132 & US Highway 41 $140,000 - Water and sewer main impacts in which IDOT will invoice Gurnee
          Utility Improvements $30,000 - Spot repairs FY11/12
          Sanitary backup mitigation cost sharing $5,000
 
Utility Surplus
Technology
          Asset Management software $26,000 - In conjunction with asset management solution in Capital Fund
 
Utility Surplus
Fleet & Professional Services
          Utility Division of Public Works $175,000 - 1 new truck with plow, hook lift system, dump bed, V body spreader, and spreader controls
          Engineering Consultant $15,000 - Professional services beyond the capabilities of staff
 
Questions & Discussion:
 
None.
 
2) Information Systems Overview        
 
Information Systems Director Chris Velkover presented the following Power Point presentation to the Board.
 
Strategic Direction
          Engage staff, officials, residents, and stakeholders using innovative means and interoperable methods
          Preserve high standards for availability, reliability, integrity, and usability of systems for internal & external users
          Advance new systems, tools, techniques, and approaches to using technology.
 
IS Division Strategic Goals
          Strategy – Access: Improve anywhere, anytime access for designated employees and selected data sources.
          Measure – Acquire and Implement Permitting / Enforcement / Work Order / Asset Management Software.
          Budget – Capital Accounts / Projects for Community Development & Public Works.
          Strategy - Consolidate & Virtualize: Reduce hardware, software & support costs, while improving performance, availability & recoverability.
          Measure - Reduce overall physical server count by an additional 20%, Jan 1, 2011 vs. 2012.
          Budget – Virtualization Hardware and Software costs in departmental budgets (70-06 & 70-07); Capital Project for SAN (storage) expansion.
          Strategy – Transparency: Make meeting recordings readily available for both internal and public access.
          Measure – On-line internal access to all historical digitally recorded meeting video and audio by January 1, 2012.
          Budget – Staff time for gathering and consolidating file storage / developing intranet & public website access mechanism.
 
IS Budgeted Expenditures over the Past 10 years by Type
          The previous 2 fiscal years Departments postponed Capital Expenditures due to the decline in the Village’s elastic revenues, FY 11/12 returns to a more typical expenditure request. Software maintenance comprises the bulk of the expenditures, followed by hardware purchases and maintenance.
 
IS Budgeted Expenditures over the Past 10 years by Department
          Increase in Vehicle Maintenance related to computerized fleet analysis update in FY 11/12. In addition, Community Development is increasing due to new software. 
 
FY 11/12 Budget Request
          Maintenance is 60% of the FY 11/12 request. Public Safety is 58% of expenditures. The majority of expenditures related to the Communications Division are budgeted in the 911 Fund.
 
2010 IS Request Hours by Department
          Public Safety ~ 65% and is up significantly
          InfoSys ~ 10%, down from 14% last year,
          Public Works ~ 10% steady
          Community Development ~4%, but expecting increase next year in both Community Development and Public Works are it relates to the implementation of new software.
 
PC Workstation Inventory
          FY 11/12 budget returns the Village to a 10 year replacement schedule.
 
What are the Challenges?
          Ongoing Support Competing with New Projects for Resources
          Departments Competing for Projects & Attention
          Changing external expectations
          Securing & Protecting against Loss of Data & Productivity more sophisticated & directed threats.
          Mobility & Remote Access Anywhere, anytime
          Investing finding balance between new approaches and avoiding obsolescence with limited funding
 
What are the Opportunities?
 
Changing
          Resident expectations of how they can interact with services, officials, and each other
          Internal User Population - Savvy, sophisticated, multi-taskers with new perspective on work
Leveraging
          Internal & External Partners: working cooperatively, organizations forced to re-think processes & status quo
          Technologies: Virtualization, Unified Communications, Mobility, Cloud, Social Media
 
3) 911 Fund  
 
Information Systems Director Chris Velkover presented the 911 Fund Power Point to the Board.
 
911 Fund Purpose & Revenues
          Established by the Illinois Emergency Telephone System Act and local referendum (Gurnee Ordinance 89-164).
          Revenues mostly comprised of $0.75 monthly surcharge on wire-line and wireless phone service accounts.
          Improve emergency communication equipment, procedures, and facilities.
          Administered by a 9-member board including 1 Village Board member, and 6 public safety representatives.
 
 911 Fund Expenditures
          Allowable expenditures prescribed by State statute.
          May 1, 2011 estimated cash balance ~$1,040,000. April 30, 2012 estimated ending balance of ~$794,000.
          Capital Expenditures create large year-over-year changes.
          5 Year Capital Expenditure Plan – reviewed annually.
          Change in FY 11/12 – Replacement of Mobile Data Computers ~$228k.
 
 911 Fund Expenditures FY11/12
          Salary & Wages – Part-time Dispatcher.
          Personnel Expenses – Certifications, Meetings & Conventions, Training.
          Contractual items - Connect CTY, SBC 9-1-1 Network Charge, Broadband connection for incoming VPN connections for MDCs.
          Utilities - Charges for Phone Lines, Cellular Data Service.
          Maintenance: ANI/ALI, CAD, UPS, & HVAC.
          Capital – Mobile Data Computers (MDCs); Radio Communications Equipment for the Police & Fire radio systems.
 
Questions & Discussion:
 
None.
 
It was moved by Trustee Balmes, seconded by Trustee Jacobs to adjourn the meeting.
 
Voice Vote:      ALL AYE:          Motion Carried.
 
 
Adjournment
Mayor Kovarik adjourned the meeting at 7;50 p.m.
 
 
 
Andrew Harris,
Village Clerk