Search Results
Planning and Zoning Property Maintenance Property Maintenance and Nuisance Codes are concerned with the ongoing health, safety, maintenance, and occupancy of existing structures and properties rather ...
Residents Property Maintenance Property Maintenance and Nuisance Codes are concerned with the ongoing health, safety, maintenance, and occupancy of existing structures and properties rather than the c...
Residents Prevailing Wage LEGAL NOTICE NOTICE OF VILLAGE OF GURNEE, ILLINOIS PREVAILING WAGE RATE ORDINANCE TAKE NOTICE that the Village of Gurnee, Illinois pursuant to An Act regulating wages of labo...
Ethylene Oxide Update #53: November 2, 2022: Quarter 3 stack monitoring and fugitive emissions results received by IEPA; Vantage within permitted emission cap. The Illinois Environmental Prote...
Village Board Approves Incentive Agreement for Redevelopment of Former Lowe's Site to Facilitate a Cooper's Hawk On Monday, April 12th, the Village Board approved an incentive agreement with the sit...
In this update includes: Quarter 4 stack monitoring and fugitive emissions results received by IEPA Vantage finishes 2020 at 62.44lbs released 43% under IEPA permitted emissions The Illinois ...
Ethylene Oxide Update #28: December 19, 2019 In this update: IEPA issues construction permit to Vantage limiting EtO emissions to 110lbs per calendar year: https://bit.ly/36ZdC5J IEPA provides r...
The Village of Gurnee will be performing drainage improvements by installing underground storm sewer to correct the surcharging storm sewer reported in the area of Middle Rd and Cross Rd. We will be ...
The Illinois Department of Transportation (IDOT) announced that extended ramp closures will take place at Grand Avenue (Illinois 132) and Skokie Highway (U.S. 41), in Gurnee, beginning, weather permit...
Government Village Standard Details Erosion Control Construction Entrance (DGN) Construction Entrance (PDF) Ditch Check (DGN) Ditch Check (PDF) Storm Drain Inlet Protection (DGN) Storm Drain Inlet Pro...
Business Almond Road and Dada Drive Intersection Improvements As part of the planned $11.7 million capital campaign for summer of 2018, the Village of Gurnee will be resurfacing Almond Road to help im...
Police Department Street Reconstruction Program General Information Start Date: End of July 2022 Est. Completion Date: October 15, 2022 Location: Keith Ave., Frontage Rd. (Washington St.), First St. (...