Search Results
Long before the removal of the 200,000 gallon Old Grand Water Tower in 2018, plans were underway for the construction of a 2,000,000 gallon water tower on a vacant parcel owned by the Village on Knowl...
Project Description Old Grand Avenue is one of the oldest roads in Gurnee. Underneath the roadway are miles of original water main that continue to deteriorate. The Old Grand Avenue watermain is an ...
FOR IMMEDIATE RELEASE: Date: Friday, October 8, 2021 Contact: Jodi Luka, Management Analyst Phone: (847) 599-6601 Email: jluka@fire.gurnee.il.us The Village of Gurnee and Wa...
Starting on Monday, November 15th, the Village's contractor Joel Kennedy Construction will be installing watermain on Old Grand Avenue from Depot Road to First Street, as well as up a section of Depot...
To increase water pressure west of I-94 and add redundancy and storage to the Gurnee water system, the Village is installing a two million gallon tank at 1525 Knowles Road. This tower will be a multi-...
This update includes: Quarter 1 stack monitoring and fugitive emissions results received by IEPA Vantage within permitted emission cap The Illinois Environmental Protection Agency (IEPA) has updated...
Ethylene Oxide Update #44 In this update includes: Quarter 1 stack monitoring and fugitive emissions results received by IEPA; Vantage within permitted emission cap The Illinois Environmental P...
In this update includes: Quarter 1 stack monitoring and fugitive emissions results received by IEPA; Vantage within permitted emission cap The Illinois Environmental Protection Agency (IEPA) has upd...
The Illinois Department of Transportation (IDOT) announced that extended ramp closures will take place at Grand Avenue (Illinois 132) and Skokie Highway (U.S. 41), in Gurnee, beginning, weather permit...
Village Board Approves Incentive Agreement for Redevelopment of Former Lowe's Site to Facilitate a Cooper's Hawk On Monday, April 12th, the Village Board approved an incentive agreement with the sit...
The Illinois Department of Transportation announced that a full closure will take place on Grand Avenue (Illinois 132) east of Skokie Highway (U.S. 41) in Gurnee beginning, Friday, Oct. 27, weather pe...
Ethylene Oxide Update #36 In this update includes: Second set of results from Phase III samples received Results included two days of samples from 10 locations for a total of twenty samples Fi...