Estes Ave. Water Main Replacement
General Information
- Start Date: May 2026
- Est. Completion Date: November 2026
- Location: See below
- Project Cost Awarded: $4,313,068.07
- Contractor: Everlast Blacktop
- Project Impacts:
- Lane closures
- Driveway closures
- Temporary water main shutdowns
Locations:
- Blackstone Ave.
- Estes St.
- Woodlawn Ave.
- Dorchester Ave.
- Gould St.
- Ellis Ave.
- Ferndale St.
- Drexel Ave.
Project Description
The Village's contractor, Everlast Blacktop, will be replacing the water main, hydrants and valve vaults on Blackstone Ave., Estes St., Woodlawn Ave., Dorchester Ave., Gould St., Ellis Ave., Ferndale St. and Drexel Ave. Once completed, the roads will be resurfaced. Lane and driveway closures as well as temporary water main shutdowns should be expected.
Project Updates
Update May 27, 2026: Everlast Blacktop has begun construction activities on Drexel and Ferndale with JULIE locates and directional drilling for water main installation.