Sidewalk Replacement Program

General Information

  • Start Date:  May 2025
  • Est. Completion Date: September 2025
  • Location: East of I-94 (Washington St., north along Rt. 21 to the Village's northern limits)
  • Project Cost: $250,000
  • Contractor: Schroeder & Schroeder, Inc.
  • Project Impacts:
    • Temporary lane closures
    • Temporary sidewalk closures
    • Temporary driveway closures

Project Description

The Village's contractor, Schroeder & Schroeder, Inc., will be carrying out the annual Sidewalk Replacement Program for sidewalks that meet the criteria for replacement in the general area east of I-94 from Washington St. north along R. 21 to the Village's northern limits. The contractor will be providing door hangers to residents who will lose access to their driveways prior to the work beginning. This project will have minor impacts such as temporary lane and sidewalk closures.